MEP2024Huiyang, HuizhouYB-MEP-2024-012

Battery plant HVAC systems

Temperature and humidity control for battery production areas, plus office VRV and smoke exhaust.

Battery plant HVAC systems — schematic illustration

Project facts

Gross floor area
60,000 m²
Contract duration
150 days
Actual duration
138 days
Completion
2024

Scope split

Construction10%
MEP90%

Construction timeline

2023.10
Load calculation

Plant-wide heating, humidity and cooling loads calculated

2023.12
Procurement

Chillers and terminal units ordered

2024.03
Installation

Piping, ductwork and equipment installed

2024.06
Commissioning

Full-system integrated test and performance acceptance

Location in Guangdong

GuangzhouDongguanFoshanShenzhen

Huiyang, Huizhou