All projects
MEP2024Huangpu, GuangzhouYB-MEP-2024-008
Data centre precision cooling
In-row cooling and hot/cold aisle containment for an internet data centre, with PUE below 1.25.
Project facts
Gross floor area
5,200 m²
Contract duration
45 days
Actual duration
40 days
Completion
2024
Scope split
Construction5%
MEP95%
Construction timeline
2023.11
Design
Airflow organisation and cooling load calculated
2023.12
Equipment
In-row coolers and containment installed
2024.01
Commissioning
Temperature/humidity control and redundancy tested
2024.02
Handover
PUE target met; live operation
Location in Guangdong
GuangzhouDongguanFoshanShenzhen
Huangpu, Guangzhou
Have a similar project?