Industrial2023Songshan Lake High-tech Zone, DongguanYB-ENG-2023-008
Songshan Lake smart manufacturing base — plant works
Large industrial plant with structural works, MEP installation and interior fit-out.
Project facts
Gross floor area
86,000 m²
Maximum span
36 m
Contract duration
280 days
Actual duration
265 days
Concrete volume
32,000 m³
Steel tonnage
850 t
Completion
2023
Scope split
Construction60%
MEP30%
Fit-out10%
Construction timeline
2023.03
Foundations
Piling and pile caps completed
2023.06
Structure topped out
Main structure topped out; concrete works complete
2023.09
MEP installation
Major equipment set; pipework and cabling complete
2023.12
Completion
Joint acceptance passed; handed over to operations
Location in Guangdong
GuangzhouDongguanFoshanShenzhen
Songshan Lake High-tech Zone, Dongguan
Have a similar project?
Send drawings, a bill of quantities or just a site address. We reply within one business day with an indicative scope, schedule and budget range.