Yongbiao Construction logo
YONGBIAOCONSTRUCTION
MEP / Automation

Automation that production can actually run.

Robot cells integrated with the production line, not bolted on beside it.

Reach study
Cell layout
PLC / HMI
Controls
Risk assessed
Safety
On site
Training

Automation scope

Automation that production can run, not just watch.

Cell layout

Cell layout and reach studies completed before equipment is ordered.

Controls

PLC and HMI programming integrated with the client's line controller.

Safety

Safety interlocks, light curtains and guarding to the risk assessment.

Vision

Vision and sensor integration for inspection and picking tasks.

Integration

Interface coordination with robot and process equipment vendors.

Training

Operator and maintenance training before production handover.

Project steps

  1. 01
    Requirement

    Cycle time, part family and operator tasks defined with production.

  2. 02
    Simulation

    Simulation and reach study to fix the layout.

  3. 03
    Build and test

    Installation, programming and safety validation.

  4. 04
    Handover

    Operator training and production ramp-up support.

Discuss an automation cell

Send drawings, a bill of quantities or just a site address. We reply within one business day with an indicative scope, schedule and budget range.