MEP / Power

Power systems energised on schedule.

From the incoming supply to the last circuit, with protection settings and test records that satisfy the utility.

10 kV / 0.4 kV
Voltage levels
Included
Protection studies
Handled
Utility liaison
Witnessed
Energisation

Power scope

From the incoming supply to the last circuit.

Distribution

MV and LV distribution installed and tested to utility requirements.

  • Ring main units
  • LV panels
  • Metering

Transformers

Transformer installation with type-test certificates and relay settings.

  • Oil handling
  • Protection settings

Cabling

Cable routing and termination with test records for every circuit.

  • Traywork
  • Termination
  • Insulation testing

Earthing

Earthing and lightning protection designed and measured against code limits.

Protection

Discrimination and protection coordination verified before energisation.

Utility liaison

Applications, inspections and energisation coordinated with the supply authority.

Delivery sequence

  1. 01
    Design review

    Load schedule, fault level and redundancy requirement confirmed.

  2. 02
    Procurement

    Equipment procured against the approved single-line diagram.

  3. 03
    Installation

    Installation, termination and insulation testing with records.

  4. 04
    Energisation

    Protection settings applied, energisation witnessed and documented.