Energy / Overview

Energy systems

Solar, storage and generation for industrial and commercial sites — modelled on your load, delivered to grid connection.

50 MW+
Solar capacity delivered
30+
Energy projects
10 years
O&M experience

What we bring

Power engineering general contracting qualification
New-energy generation professional contracting
Energy performance contracting (EMC) delivery model

System options and yield modelling

How the common system types are chosen, how the economics are calculated, and what happens after handover.

Choosing the PV configuration

Commercial rooftop solar has four common grid-connection arrangements. The deciding factor is the self-consumption ratio: the higher it is, the shorter the payback.

Roof condition — load capacity, usable area, orientation and shading — must be checked first. Metal and concrete roofs need different mounting systems, and structural review by the original designer may be required.

  • Self-consumption with surplus export — best for daytime production with a steady load
  • Full export — for sites with low consumption and good roof space
  • Solar plus storage — where peak/valley tariffs are wide or resilience matters
  • Off-grid — remote sites without a grid connection

Sizing storage

Storage capacity follows the load curve, peak/valley windows and demand-management target — not a fixed percentage of PV capacity. Oversizing lengthens payback; undersizing misses the peak-shaving target.

Battery selection should consider cycle life, degradation curve and fire protection. Thermal management and fire suppression are the core safety items for commercial and industrial storage.

How the economics are calculated

A yield study states its boundary conditions: annual generation from local irradiation and system efficiency, tariff weighted by the actual consumption mix, and O&M as a fixed annual cost.

Results hold only for those assumptions — tariff policy, consumption changes and equipment degradation all move the outcome. Formal proposals list the key assumptions so you can check them.

  • Self-consumption saving = self-consumed kWh × blended tariff
  • Export revenue = exported kWh × feed-in tariff
  • Payback = total investment ÷ average annual net benefit

Grid connection and operations

Connection involves an application, design review, construction acceptance and commissioning with the local utility. The timeline depends on document completeness and local approval speed, so it is planned early.

Operations cover module cleaning, equipment inspection, fault response and performance monitoring. Comparing theoretical and actual generation quickly locates shading, soiling or equipment faults.

Start with your electricity bills

Send drawings, a bill of quantities or just a site address. We reply within one business day with an indicative scope, schedule and budget range.